No More Open Holes In Our Bathroom Floor February 28th, 2008

Pouring ConcreteWorking It
Pouring ConcreteConcrete in Full

This news is over a week old but I want to document our remodel and this was a big step. All of the plumbling in the bathroom is done and the holes in the floor are no longer. Maeve was quite pleased by this. Now that the hard part is over, I’d say that remodeling on a slab foundation is not for the faint of heart.

In other news the bedrooms are just about all painted (pictures of those soon) and we got a new electrical panel the other night and we are getting a new furnace and central air tomorrow.

Its coming along.

Posted in Our House, The Remodel | 4 Comments

Its Coming Along (Bathroom Update 1) February 14th, 2008

Going To Be The Full BathGoing To Be The Master BathMaster Bath
Demo - Full BathMaster BathMaster Bath
Full BathPost Concrete-CuttingRumble Pile

We are a week and a half onto our remodel and a lot has already changed. After several late nights, scary rented tools, and a lot of dust the bathroom is completely torn out (including the floor) and is on its way to being two bathrooms. We (Ian and Rich) have most of the plumbing done and we are just about ready to start covering everything back up.

Thanks to Ian, Rich, and Shirls for all the help so far and to Maeve for being such a trooper in her final trimester of pregnancy.

p.s. If you want to see more house click here.

Posted in Our House, The Remodel | 13 Comments

Our New House February 5th, 2008

Our New House - MLS pics

Here are some pics of our new house. These pictures are just from the MLS listing. I still need to take a bunch. We already begun remodeling so I’ll keep you posted with more before and after pics.

Come on by to check it out, we’ll be there working.

Posted in Announcements, Our House | 12 Comments